
Pipeline cleaning, planned around your operation
Specify pipe geometry, deposits, access points and operating limits for a custom equipment package.
How does the equipment fit the process?
A prepared ice-and-liquid mixture is introduced into a selected pipe section and moved towards a collection point. Generation, storage and delivery need to support the required cleaning cycle. Read the process guide for the sequence and planning questions.

Which equipment can GTMICE supply?
Choose an ice slurry generator from the common GTM catalogue or discuss a containerized mobile package. GTMICE supplies equipment; the customer provides the vehicle and arranges cleaning operations.
What makes a pipe suitable for assessment?
| Input | What to provide |
|---|---|
| Circuit | Use, material, bore, length, bends, valves and access points. |
| Deposits | Type, severity, samples or photographs, and current cleaning method. |
| Operating limits | Permitted pressure, temperature, fluid composition and downtime. |
| Site arrangements | Isolation, injection, collection, utilities and operator responsibilities. |
Can it be configured for a drinking-water network?
The proposal must address the network’s water, wetted-material and verification requirements. The equipment model alone is not evidence of potable-water approval. Define those requirements with the network owner before finalizing the package.
Can glass tubes in algae systems be assessed?
Yes. Use the algae glass-tube cleaning route to document tube condition, joints, geometry and acceptable operating limits. A representative trial should precede full-system use.