Seafood Expo North America and Seafood Processing North America bring seafood products, equipment and services into one marketplace. A useful chilling equipment brief connects the production need with installation costs, operating conditions and acceptance evidence. Buyers should compare the complete delivery scope and the proposed handling result, not simply a machine’s headline price or catalogue output.
Seafood Expo North America returned to in-person exhibitions in March 2022 after cancellation of the physical Boston show planned for July 2021. The 2026 edition ran on 15–17 March at the Thomas M. Menino Convention and Exhibition Center, formerly known as Boston Convention & Exhibition Center.

Exhibition dates, 2021–2026
| Edition | Exhibition dates | City and venue | Status at 7 October 2026 | Official or primary source |
|---|---|---|---|---|
| 2021 | Not available | Boston, Massachusetts, USA; physical edition cancelled | Physical exhibition cancelled | Organizer-owned publication |
| 2022 | 2022-03-13 to 2022-03-15 | Boston Convention & Exhibition Center, Boston, USA | Held | Official source; Participant report |
| 2023 | 2023-03-12 to 2023-03-14 | Boston Convention & Exhibition Center, Boston, USA | Held | Official source |
| 2024 | 2024-03-10 to 2024-03-12 | Boston Convention & Exhibition Center, Boston, USA | Held | Official source |
| 2025 | 2025-03-16 to 2025-03-18 | Boston Convention & Exhibition Center, Boston, USA | Held | Official source |
| 2026 | 2026-03-15 to 2026-03-17 | Thomas M. Menino Convention and Exhibition Center, Boston, USA | Held | Official source |
What should a procurement brief make visible?
- Production need: Record product form, incoming temperature, daily throughput and the busiest batch window. Explain the existing method and the specific handling problem the project should address.
- Rating conditions: Request the basis for stated output and identify available water and power conditions. Treat destination electrical and installation requirements as explicit quotation inputs.
- Complete cost scope: Separate equipment, accessories, transport, installation and customer works. Compare like-for-like boundaries before drawing conclusions from the quoted total.
- Handover and verification: Agree the documents, operating guidance and trial measurements needed for acceptance. Identify who will operate and maintain the equipment after installation.
The business case should distinguish measured results from assumptions. Temperature records and a representative product trial can inform configuration, but an equipment demonstration alone does not establish shelf life, product quality or savings. Record the baseline and the proposed evaluation method before attributing commercial benefits to the new arrangement.
Buyer questions
What should I prepare before a supplier meeting?
Bring a production-load profile, utility information, installation layout and the acceptance requirements that all suppliers should address.
Why do the venue names differ between years?
The sources use the historical BCEC name and, in 2026, the Thomas M. Menino name.
Can installation requirements change the quotation?
Yes. Utilities, layout, connection work and the delivery boundary should be defined before comparison.
What supports a claimed product benefit?
A documented evaluation of the actual product, procedure, conditions and agreed outcome.
Compare the GTM equipment range and send Roy your production need, site conditions and requested handover requirements.
compare GTM equipment · prepare a chilling equipment enquiry