China Marine Economy Expo provides a broad marine-industry setting for considering equipment integration. Buyers evaluating slurry ice for a shore facility or a proposed marine installation should define the operating environment, utilities, available space and installation responsibilities first. A general marine exhibition does not establish that a particular machine is approved for every vessel or offshore application.
China Marine Economy Expo moved from Shenzhen’s Futian venue to Bao’an in 2025. The 2026 edition is scheduled for 22–24 October at Shenzhen World Exhibition & Convention Center and remains upcoming as of 7 October. Its broad marine-industry programme is relevant to equipment integration, utilities and installation planning.

Exhibition dates, 2021–2026
| Edition | Exhibition dates | City and venue | Status at 7 October 2026 | Official or primary source |
|---|---|---|---|---|
| 2021 | Not available | Shenzhen Convention and Exhibition Center, Futian, Shenzhen, China | Postponed; revised date unconfirmed | Government report |
| 2022 | 2022-11-24 to 2022-11-26 | Shenzhen Convention and Exhibition Center, Futian, Shenzhen, China | Held | Government report |
| 2023 | 2023-11-23 to 2023-11-25 | Shenzhen Convention and Exhibition Center, Futian, Shenzhen, China | Held | Government report |
| 2024 | 2024-10-31 to 2024-11-02 | Shenzhen Convention and Exhibition Center, Futian, Shenzhen, China | Held | Government report |
| 2025 | 2025-10-28 to 2025-10-30 | Shenzhen World Exhibition & Convention Center, Bao’an, Shenzhen, China | Held | Government report |
| 2026 | 2026-10-22 to 2026-10-24 | Shenzhen World Exhibition & Convention Center, Bao’an, Shenzhen, China | Scheduled; upcoming at 7 October 2026 | Government report |
What should a marine equipment brief include?
- Installation setting: State whether the equipment is for a shore plant, port facility or proposed vessel installation. Describe exposure, access, space and the conditions the equipment must withstand.
- Utilities: Provide available voltage, frequency, water conditions and heat-rejection arrangements. Identify restrictions that could affect the proposed generation duty.
- Mechanical interfaces: Supply a layout with installation dimensions, connection points and maintenance access. Any mounting, structural or vessel-specific requirements need project-level review.
- Responsibility split: Define who handles installation, commissioning, operator training and local approvals. Record the agreed boundary in the quotation rather than relying on a general product description.
The highest-value discussion may be with the integrator as well as the equipment supplier. A machine can be only one part of the final arrangement; power, water, heat rejection and material handling must work together. Resolve these interfaces before using nominal output to select a model.
Buyer questions
Does a marine exhibition imply vessel certification?
No. Any required approval must be established for the quoted configuration and intended installation.
Which Shenzhen venue applies to the 2026 event?
The announced venue is Shenzhen World Exhibition & Convention Center in Bao’an.
Can a shore-based installation use the same enquiry process?
Yes. Define its actual utilities, layout, operating conditions and acceptance needs.
Does GTMICE supply the customer’s vehicle?
The confirmed containerized cleaning offer is designed around a customer-provided vehicle.
Compare the generator range and provide your installation setting, utility limits and integration drawings for a focused equipment discussion.
compare the generator range · containerized cleaning equipment · discuss equipment integration